May 2025
Following a complete isolation and strip out of the old workshop at the commercial premises, we have installed new dado trunking, sockets and LED lighting to suit the clients needs. Forming a future office space with CAT 6 ethernet outlets and anti glare LED 600 x 600 fittings suitable for use with PC monitors.
May 2025
Installation consisting of new LED lighting, electric bike charge points and a dedicated consumer unit. Installed with galvanised conduit to prevent damage to the supply cables. Installation consisting of new LED lighting, electric bike charge points and a dedicated consumer unit. Installed with galvanised conduit to prevent damage to the supply cables.
February 2025
Full renovation of domestic property. Throughout this project M&H Electrical have rewired the property including all new accessories, external lighting and power. Smoke detection throughout, full S plan ++ heating controlled effortlessly with HIVE integration and a complete consumer unit upgrade. The team has worked effortlessly to ensure all the clients needs have been met to a high standard.
December 2024
Full replacement and installation of new garden lighting and driveway lights with LED bollards. The team have worked through the cold and snowy weather to complete this project, we have also completed a consumer upgrade to ensure the installation meets the most recent regulations for safety.
December 2024
3 Phase EV installation completed at the NEC Birmingham. The client requested a dual charger to be installed for the ability to charge the new driverless buses at the NEC complex. The team have configured this charger to have operation with Solihull council’s management team giving them full control and monitoring of the charger’s output power.